Commit graph

539 commits

Author SHA1 Message Date
Reinier Balt
7bce774daa get context list scenario passing 2012-05-01 09:39:53 +02:00
Reinier Balt
c9d64e6f4b get the first cucumber feature running: calendar 2012-04-30 13:56:42 +02:00
Reinier Balt
63175c115b all non-cucumber tests are passing 2012-04-30 13:56:41 +02:00
Reinier Balt
13b58f3a10 all unit and functional tests are passing 2012-04-30 13:56:40 +02:00
Reinier Balt
96db48dd86 get project integrations and login controller tests running 2012-04-30 13:56:40 +02:00
Reinier Balt
59a4d5ede0 make functional tests for context controller run 2012-04-30 13:56:39 +02:00
Reinier Balt
76340b780c Getting functional tests running. 2012-04-30 13:56:38 +02:00
Reinier Balt
fd433d76d8 fix all upgrade warnings from the rails_upgrade plugin 2012-04-30 13:56:38 +02:00
Reinier Balt
e964769553 home page is restored, so is context view 2012-04-30 13:56:37 +02:00
Reinier Balt
4605b17d3c home page renders... sort of 2012-04-30 13:56:35 +02:00
Reinier Balt
a83c8b3f92 initial upgrade to rails 3.2.3 2012-04-30 13:56:33 +02:00
tim madden
b932ac210f fix for mobile new todo tags no being saved
the mobile interface shares the form for creating and updating todos.
the todo controller was using different names for them. this change
aligns them.
2012-04-28 22:44:35 -05:00
tim madden
3180d88fae tweak to note display on project page to stop wrapping around note link icon
divs for the project note
  adding margin to prevent the note from wrapping around the link icon
2012-04-21 11:14:19 -05:00
tim madden
d27ffb6ce0 mobile tuning
change to make nav links even and consistent
  looking to make text bigger for fat fingers
  change to project nav
  adding images for arrows
2012-04-16 10:04:09 -05:00
Tim Madden
343a4a5846 fixing extra argument on mobile projects page 2012-04-16 09:52:26 -05:00
Reinier Balt
e74f8842ae Get more i18n fixed in for he locale. Include fallback to en locale and include pluralization mechanism 2012-04-16 13:19:04 +02:00
Reinier Balt
22feb7d7eb add i18n to last stats graph and update locales (google translate) 2012-04-12 14:18:08 +02:00
Reinier Balt
a4d98a705a make cucumber scenarios pass 2012-04-12 13:36:49 +02:00
Reinier Balt
f32e5b256b further i18n changes for Hebrew, impacting other locales too 2012-04-11 21:10:19 +02:00
Reinier Balt
ac270884ed add more translations for he locale. Contributed by Darian Shalev 2012-04-11 20:22:05 +02:00
Reinier Balt
784b7434f6 add some missing translations for #1276 2012-04-10 20:29:37 +02:00
Reinier Balt
8d6b9b5dbd fix regressions 2012-04-04 20:04:08 +02:00
Reinier Balt
c7637053e1 fix #1268. The default context in the new todo form on the home page is now the first active context
Instead of the first context that could be hidden and thus appear random. Also fix setting the default context based on the project you select.
2012-04-03 20:32:15 +02:00
Reinier Balt
2aef2b5622 fix regression for editing project settings from project page 2012-04-03 13:41:09 +02:00
Reinier Balt
ff4a376ee9 fix #1245 by managing pages with more than one project in a list
Update still looks ugly. I'd like to see things more seperated for project list page and review page. Todo!
2012-03-29 21:14:48 +02:00
Reinier Balt
af10e74017 fix #1242 by fixing all the routing from the review button 2012-03-29 16:05:17 +02:00
Reinier Balt
b911e3010b fix #1252 by updating the todo ical feed and adding comment that todo ical is not for calendars. Also fix layout of feeds page 2012-03-24 10:52:44 +01:00
Reinier Balt
dd957f0feb fix #1255. Context view now has seperate container for pending and deferred todos 2012-03-23 14:04:55 +01:00
Reinier Balt
dea8734498 fix #1256 by changing the layout of the context view to match the project view 2012-03-21 18:09:20 +01:00
Reinier Balt
d8b5c7d0d2 cleanup old selenium initializer stuff and migrate edit_a_todo 2012-03-19 14:06:33 +01:00
Reinier Balt
d193e21ee0 migrate dependencies and admin feature 2012-03-19 14:06:33 +01:00
Reinier Balt
c8ab797924 finish drag and drop for context list. Works even for webkit :-) 2012-03-19 14:06:32 +01:00
Reinier Balt
4a8fdbabc2 migrate context and context_list features. Drag and drop is still WIP 2012-03-19 14:06:32 +01:00
Reinier Balt
de309c8ee8 migrate calendar feature 2012-03-19 14:06:31 +01:00
tim madden
a8a18482c3 more defers 2012-03-01 17:16:14 -06:00
tim madden
6d50992dfb putting back the date and counter 2012-03-01 17:16:14 -06:00
tim madden
8c18c2888a updates to mobile layout
removing count and date as space is at a premium and not essential
  making menu padding larger to provide more space to click
  removing duplicated menus to stop wrapping
  Increasing the top margin above the content div to reduce fat fingers from clicking links in the content instead of the intended nav links
  Cleaning up some unused selectors and consistent spacing, etc...
2012-03-01 17:16:14 -06:00
Reinier Balt
00ddcbc9fa upgrade to jquery 1.7.1 and jquery-ui 1.8.17 2012-02-15 21:43:51 +01:00
Reinier Balt
e935066c18 fix #1181. The project listing now had the small drag handle and all the controls to the left. 2012-01-27 10:55:39 +01:00
Reinier Balt
8b13ee88ab fix #1234 by checking on :review source view 2012-01-23 12:27:49 +01:00
Reinier Balt
1bce9a670d implement #1030. 2012-01-21 20:20:24 +01:00
Reinier Balt
bc7bf459db fix small regressions 2012-01-20 23:50:27 +01:00
Reinier Balt
78a2bd7f49 further refactoring of stats controller and views 2012-01-20 23:35:00 +01:00
Reinier Balt
b948cc48b2 further refactoring and more tests 2012-01-20 23:35:00 +01:00
Reinier Balt
2349bee535 further refactorings and tests
one test is failing, will fix that next time
2012-01-20 23:34:59 +01:00
Reinier Balt
61624ed455 completed first pass of refactoring 2012-01-20 23:34:58 +01:00
Matt Rogers
bd10e61dbd Merge pull request #58 from maddentim/defer_options
Defer options
2012-01-09 19:49:43 -08:00
tim madden
e9277676b2 updates to tests for changes to mobile interface
Updated mobile_add_action.feature with new navigation text
  Updated modile_edit_a_todo.feature to not look for removed 'done' checkbox in
  the edit form, but to use the previously created "mark complete" button.
  Added completed_container to mobile_actions so the test could find the
  completed todo that is no longer not visible
2011-12-20 10:35:21 -06:00
Tim Madden
c7cd46ee1d update to mobile todo edit view
removing the done checkout
   (with new intermediate mobile todo view with done button, this is
    needed)
rearranging fields to put the most important fields first
2011-12-19 21:14:38 -06:00
Tim Madden
eaa4a46359 theming mobile layout to mirror standard layout styling
the span with class m_t and m_t_d and its styling are no longer needed
  mobile todo lists need to be wrapped in ul element. fixing up missing or unclosed
2011-12-19 21:14:38 -06:00