* Installed the RJS plugin http://www.codyfauser.com/articles/2005/12/05/rjs-templates-plugin-subversion-repository
* Used the RJS templates to update multiple page elements on addition and deletion of actions: the new action gets added, the count 'badge' is updated correctly, and a status area provides helpful information.
* If your data entry triggers validation errors e.g. no description for the next action), the errors are displayed in the status area (not very prettily as yet...)
* The message about the context/project having no uncompleted actions automagically appears/disappears without refreshing the page.
The editing and toggling of actions hasn't been updated yet.
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@171 a4c988fc-2ded-0310-b66e-134b36920a42
It works fine except in the following circumstances, which I can't seem to figure out:
* If you edit an action on a project page, it will render with '[P]' link until you refresh
* If you mark an action completed on a project page, it will also render with a '[P]' link until you refresh.
However, adding a new action on a project page renders properly immediately.
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@167 a4c988fc-2ded-0310-b66e-134b36920a42
As a result, I'm going to redo the empty message changes I made in [164], and will see if I can find a more sensible way to implement them. The empty messages still appear (now also in the notes area if that's empty), but you need a refresh after Ajax changes to view or remove them.
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@165 a4c988fc-2ded-0310-b66e-134b36920a42
I've added Scriptaculous calls to the Ajax for adding a new action, or completing a previously not done action removes the appropriate message (as these activities must logically make @not_done and @done non-empty. Similar thing added for project notes.
The next step will be to handle those cases where the last action is completed or deleted, or an unchecked done item refills the not_done actions, which is trickier to pick up. Then I'll repeat for context and todo views.
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@164 a4c988fc-2ded-0310-b66e-134b36920a42
* Fixed unchecking of next actions on context and project pages, so that they now update visually, as well as changing the database.
* For some reason, the completion field was not being saved, which was messing up the completed page. That's fixed now.
* Deletion and editing of items was broken on context/show and project/show. That's fixed now, but if you uncheck a completed item, then attempt to delete or edit an item without a refresh it will fail. I'm not sure what I can do about this.
* Next actions on project and context pages now show the appropriate link to contexts and projects respectively, even when first created by Ajax.
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@162 a4c988fc-2ded-0310-b66e-134b36920a42
Fixed#142 - the 500 error was being generated on dragging projects and contexts to reorder because the order method was looking for an order view and layout. I've added a :render => nothing statement to order now,and that seems to fix the error.
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@158 a4c988fc-2ded-0310-b66e-134b36920a42
Also changed references to Form.focus_first which were defined in the removed file prototype-ex.js to Form.focusFirstElement, which is defined in prototype.js. Fixes#133.
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@149 a4c988fc-2ded-0310-b66e-134b36920a42
1. The contexts and projects lists are now drag and droppable. In other words, if you visit [tracks_url]/projects or [tracks_url]/contexts, you can grab the 'DRAG' handle with the mouse and drag and drop the projects or contexts into your preferred order. At the same time, this re-orders the 'position' column appropriately, so that changes in order will be reflected on other pages. '''NB''': At the moment, deleting projects and contexts is a bit buggy. The item doesn't disappear, but if you refresh the page it will update appropriately. Also, if you add a new item, you can't drag it until you refresh. I'll try to fix these things. Fixes#115.
2. Fixed typo of 'tomorrow' due date label. Fixes#131
3. I updated the syntax for some of the visual effects to use the new {{{visual_effect(:fade, 'element')}}} syntax. Also removed the javascript files effects2 and prototype-ex, which aren't used now.
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@148 a4c988fc-2ded-0310-b66e-134b36920a42
The problem was that project (and context) names were made into URLs via the 'urlize' method which substituted spaces for underscores and downcased the string. This was then converted back to the real project name by the Rails method 'humanize', which substituted spaces for underscores and Capitalized the string (i.e. only the first word was given an initial capital). This meant that visiting /project/show/project_name would fail if the real project name was either 'Project Name' or 'project name'.
I altered 'urlize' to maintain the capitalization that was entered, and created a new method 'deurlize' that just reversed this change (i.e. swapped underscores for spaces, but left capitalization as is).
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@101 a4c988fc-2ded-0310-b66e-134b36920a42
This seems a more robust method, and is much simpler to use. The month is given as a name rather than a number, so it's obvious what should be entered.
git-svn-id: http://www.rousette.org.uk/svn/tracks-repos/trunk@17 a4c988fc-2ded-0310-b66e-134b36920a42