Commit graph

10 commits

Author SHA1 Message Date
Brett A. Rogers
9820143dee Move calendar test down to unit tests
Remove tests that are specific to the calendar model from controller
test and move them to unit tests.
2013-07-28 13:27:28 +02:00
Brett A. Rogers
d541fc24d7 Fix setup for calendar controller test
Ensure that the expected todos are actually due in the same month
2013-07-28 13:27:28 +02:00
Don Cruse
70f633c150 Shifting more instance variables to the controller
Also removing some instance variables that were never invoked in the
views. This sets up a future refactoring of the method of comptuting
rolling averages, which differs between the two types of "last year"
views being refactored.
2013-07-18 21:01:39 -05:00
Don Cruse
1493304fc1 Refactor last year chart
Pulled some instance variable assignment into the controller.

Also extracted a method regarding interpolated values for the present
month.
2013-07-18 16:17:30 -05:00
Reinier Balt
2daffef683 fix failing tests 2013-06-17 10:06:38 +02:00
Reinier Balt
4a485558e2 Merge branch 'master' into rails4
Conflicts:
	Gemfile.lock
	config/routes.rb
2013-06-17 09:25:02 +02:00
Reinier Balt
671f64b419 move to strong_parameters of rails4. 2013-05-27 12:44:31 +02:00
Reinier Balt
08498fee4f fix failing tests
Includes a monkey patch for Arel that may need to be removed when 4.0.0 final ships
2013-05-13 15:35:21 +02:00
Reinier Balt
80974fb0d5 empty non-saved project caused rss builder to fail 2013-05-13 12:50:10 +02:00
Reinier Balt
0bc9b0397a move tests to new directory 2013-05-11 23:13:16 +02:00